9.5

Configuration Console

126

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

10

Example — SNMP Communication with OPC

128

. . . . . . . . . . . . . . . . . . . . . . . . . . .

10.1

Hardware and Software Installation

129

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

10.2

Configuration of the SNMP OPC Server

130

. . . . . . . . . . . . . . . . . . . . . . . . .

10.2.1

Editing the Plant Configuration

132

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

10.3

Configuring the PC Station

135

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

10.4

Using the OPC Scout

138

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

10.4.1

Establishing a Connection to the Server

138

. . . . . . . . . . . . . . . . . . . . . . . . .

10.4.2

Inserting a Group

139

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

10.4.3

Setting the Trap Recipient based on the Example of an OSM/ESM

141

. .

10.5

Creating a Device Profile with the MIB Compiler

143

. . . . . . . . . . . . . . . . . .

11

Example — PROFINET Communication with OPC

147

. . . . . . . . . . . . . . . . . . . . . . .

11.1

Hardware and Software Installation

148

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

11.2

Configuring the PC Station

149

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

11.3

Using Symbol Files

151

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Tools and Utilities

12

Station Configuration Editor Tool

153

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

12.1

Characteristics, Functions and Activation

153

. . . . . . . . . . . . . . . . . . . . . . . .

12.2

Managing Components: “Components” Tab

154

. . . . . . . . . . . . . . . . . . . . . .

12.3

Evaluating Messages: “Diagnostics” Tab

158

. . . . . . . . . . . . . . . . . . . . . . . . .

12.4

Setting the Station Configuration Editor: “Properties” Dialog

158

. . . . . . . .

13

SIMATIC NCM PC Project Engineering Tool

160

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

13.1

Characteristics, Functions and Activation

160

. . . . . . . . . . . . . . . . . . . . . . . .

13.2

Relationship Between SIMATIC NCM PC and STEP 7

163

. . . . . . . . . . . .

13.3

Creating a PC Station

165

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

13.4

Configuring a PC Station with SIMATIC NCM PC Config

168

. . . . . . . . . . .

13.5

Creating the DP Master System

171

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

13.6

Creating a PROFINET IO System

173

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

13.7

Configuring Connections

175

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

13.8

Project Engineering for a PC Station as DP Slave

177

. . . . . . . . . . . . . . . .

13.8.1

DP Master is Known in NCM / STEP 7

177

. . . . . . . . . . . . . . . . . . . . . . . . . .

13.8.2

Configuration with a “Third - party” DP Master

182

. . . . . . . . . . . . . . . . . . . .

13.9

Downloading Project Engineering Data to the PC Station (after Initial
Configuration)

184

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

13.9.1

Online Mode

185

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

13.9.2 Offline Mode (Engineering Station and Runtime PC Separate) - XDB Import 187