Siemens Commissioning PC Stations C79000-G8976-C156-07 User Manual

Page 237

Advertising
background image

16

Configuration Console Tool

237

Commissioning PC Stations - Manual and Quick Start
Release 5/2005

C79000-G8976-C156-07

Activity

2

After the call, the bus nodes are queried and displayed.

Four different symbols are used to indicate the operating mode of a station:

S

Empty box with gray background (the same background color as tabs): No partner device
found

S

Empty box with bright background: Passive station (for example DP slave)

S

Check mark on bright background: Active station (for example DP master)

S

Check mark on gray background: Active station ready to enter network

3

Click the “Update” button again to access the module and query the bus nodes.

Advertising