3 commissioning for configured mode - overview – Siemens Commissioning PC Stations C79000-G8976-C156-07 User Manual

Page 22

Advertising
background image

1

Welcome to Advanced PC Configuration

22

Commissioning PC Stations - Manual and Quick Start

Release 5/2005

C79000-G8976-C156-07

1.4.3

Commissioning for Configured Mode - Overview

When commissioning in the configured mode, three situations can be
distinguished. The situation depends on whether or not project engineering data is
already available in the form of an XDB file or whether commissioning is
independent of project engineering (no XDB file).

Initial configuration means the step in commissioning at which the module is
switched to “configured mode” and obtains addresses and network parameters .

S

Case aInitial Configuration by Remote Configuration with STEP 7 / NCM
PC

With this method, it is assumed that the PC station and its components and
applications is first created in project engineering in STEP 7 / NCM PC. The
target PC station that can be reached over an Ethernet adapter (online) is then
configured remotely over STEP 7 / NCM PC (applies to Ethernet and
PROFIBUS).

The advantage of this is that the project engineering data and the PC
configuration are consistent and the total effort is minimal.

Step

How does it work?

Tool

1. Installing SIMATIC

NET Software on the
Engineering PC/PG
and on the PC Station

Install the SIMATIC NET software
based on the installation instructions

SIMATIC NET CD / Windows

2. Installing the

hardware (PC
modules)

Install the communication module in the
PC station

Refer to the documentation on the
CP

3. Project Engineering

on the PC Station

Steps in project engineering of the PC
station:

S

Create the PC station in NCM PC

NCM PC / STEP 7

S

SIMATIC Manager

S

Enter modules and applications

S

HW Config

S

Create connections in NetPro

S

Use symbols (in the project
engineering of the OPC server)

S

NetPro

S

HW Config

4. Initial configuration

Remote configuration with the menu
command “PLC

"

Configure”

NCM PC / STEP7

5. Downloading the

Project Engineering
Data to the PC Station

Download the project engineering data
with the menu command ”PLC

"

Download”

NCM PC / STEP7

Result:

PC station is ready for productive communication

6. Testing the

configuration

Configuration Console

Configuration Console

Advertising