Siemens Commissioning PC Stations C79000-G8976-C156-07 User Manual

Page 124

Advertising
background image

9

Example — Unspecified Connection from a PC Application

124

Commissioning PC Stations - Manual and Quick Start

Release 5/2005

C79000-G8976-C156-07

9.4.3

Downloading the Project Engineering Configuration

Activity

1.

With “PLC

"

Download to Current Project

"

Selected Stations”, the project engineering data

is loaded locally in the Station Manager on your PC.

Loading deletes the existing data on the relevant component and overwrites it with the new
information.

Confirm with “Yes”.

The following message is displayed.

2.

Confirm with “OK” to complete the loading and to start the module.

Advertising