How to Make the ”Initial Configuration with an XDB File”
3
If you want to prevent project engineering data from being transferred online at a later point in
time, select the “Work offline...” option...”. The default is that project engineering data can be
transferred online.
Result:
PC station is ready for productive communication
S
Module addresses are set;
S
Communication connections configured in the project engineering
are established;
S
Variables can be accessed using symbols configured in the project
engineering.
Tip:
You can also follow this procedure in the example “OPC Configuration for Industrial
Ethernet” in this manual; see Section 7.
Where to we go from here?
you can now use the other tools from SIMATIC NET for diagnostics,
commissioning, and testing.