13
SIMATIC NCM PC Project Engineering Tool
181
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
Follow the steps below:
Follow the steps outlined below:
1.
To create inputs and outputs in the project engineering, select universal modules under ”PC
station as DP slave” in the catalog and insert them in the list.
2.
By double - clicking on the inserted universal module, you can configure the module with the
required I/O types.