Unpacking and inspecting the parts – Network Instruments GigaStor 114ff User Manual

Page 18

Advertising
background image

Unpacking and inspecting the parts
Chapter 2 Installing Your GigaStor

18

rev. 1

The general steps to install your GigaStor are:

F

“Unpacking and inspecting the parts” on page 18

F

“Installing the GigaStor and connecting the cables” on page 19

F

“Connecting Observer to the GigaStor” on page 22

Additional steps to complete the installation are:

F

“Configuring Observer for your Gigabit device” on page 31

F

“Configuring Observer for your WAN device” on page 33

F

“Tapping an Ethernet or Fibre Channel connection” on
page 37

F

“Tapping a WAN connection” on page 42

F

“Installing the drives in your GigaStor” on page 50

Unpacking and inspecting the parts

Your GigaStor includes a number of components. Take a moment
after unpacking the kit to locate all of the parts.

F

One rack-mountable GigaStor system with an installed 10/
100/1000 Ethernet network interface (management) card.

F

Appropriate capture interface (Gen2 or WAN).

F

The rack unit may also include a rail kit depending on
which model was purchased.

F

Windows XP 64-bit operating system and a restore DVD
specific for your GigaStor.

F

TAP kits for your topology (Ethernet, Fibre Channel, or
WAN), except for the GigaStor 2TE.

F

Cables

F

Ethernet cable for each 10/100/1000 interface in your
GigaStor.

F

Connection cables to connect your GigaStor to a TAP or
switch.

Advertising