k) It should be noted that the connecting pipelines

must be individually supported, and that the

spring mounted baseplate is not intended to

support total static pipe loads.

Figure 4-4

4.3.4.3 Stilt/spring mounted baseplates - motor

alignment

The procedure for motor alignment on stilt or spring

mounted baseplates is similar to grouted baseplates.

The difference is primarily in the way the baseplate is

leveled.

a) Level the baseplate by using the stilt adjusters.

(Shims are not needed as with grouted

baseplates.)

b) After the base is level, it is locked in place by

locking the stilt adjusters.

c) Next the initial pump alignment must be checked.

The vertical height adjustment provided by the

stilts allows the possibility of slightly twisting the

baseplate. If there has been no transit damage

or twisting of the baseplate during stilt height

adjustment, the pump and driver should be within

0.38 mm (0.015 in.) parallel, and 0.0025 mm/mm

(0.0025 in./in.) angular alignment. If this is not

the case, check to see if the driver mounting

fasteners are centered in the driver feet holes.

d) If the fasteners are not centered there was likely

shipping damage. Re-center the fasteners and

perform a preliminary alignment to the above

tolerances by shimming under the motor for

vertical alignment, and by moving the pump for

horizontal alignment.

e) If the fasteners are centered, then the baseplate

may be twisted. Slightly adjust (one turn of the

adjusting nut) the stilts at the driver end of the

baseplate and check for alignment to the above

tolerances. Repeat as necessary while

maintaining a level condition as measured from

the pump discharge flange.

f) Lock the stilt adjusters.

The remaining steps are as listed for new grouted

baseplates.

4.4 Grouting

a) The pump foundation should be located as close

to the source of the fluid to be pumped as

practical.

b) There should be adequate space for workers to

install, operate, and maintain the pump. The

foundation should be sufficient to absorb any

vibration and should provide a rigid support for

the pump and motor.

c) Recommended mass of a concrete foundation

should be three times that of the pump, motor

and base. Refer to figure 4-5.

Foundation bolts are imbedded in the

concrete inside a sleeve to allow some

movement of the bolt.

Figure 4-5

d) Level the pump baseplate assembly. If the

baseplate has machined coplanar mounting

surfaces, these machined surfaces are to be

referenced when leveling the baseplate. This may

require that the pump and motor be removed from

the baseplate in order to reference the machined

faces. If the baseplate is without machined

coplanar mounting surfaces, the pump and motor

are to be left on the baseplate. The proper

surfaces to reference when leveling the pump

baseplate assembly are the pump suction and

discharge flanges. DO NOT stress the baseplate.

e) Do not bolt the suction or discharge flanges of

the pump to the piping until the baseplate

foundation is completely installed. If equipped,

use leveling jackscrews to level the baseplate. If

jackscrews are not provided, shims and wedges

should be used. (See Figure 4-5.) Check for

levelness in both the longitudinal and lateral

directions. Shims should be placed at all base

anchor bolt locations, and in the middle edge of

the base if the base is more than 1.5 m (5 ft.)

long. Do not rely on the bottom of the baseplate

to be flat. Standard baseplate bottoms are not

machined, and it is not likely that the field

mounting surface is flat.