2 TRANSPORT AND STORAGE

2.1 Consignment receipt and unpacking

Immediately after receipt of the equipment it must be

checked against the delivery/shipping documents for

its completeness and that there has been no damage

in transportation. Any shortage and/or damage must

be reported immediately to Flowserve Pump Division

and must be received in writing within ten days of

receipt of the equipment. Later claims cannot be

accepted.

Check any crate, boxes or wrappings for any

accessories or spare parts that may be packed

separately with the equipment or attached to side

walls of the box or equipment.

Each product has a unique serial number. Check

that this number corresponds with that advised and

always quote this number in correspondence as well

as when ordering spare parts or further accessories.

2.2 Handling

Boxes, crates, pallets or cartons may be unloaded

using fork lift vehicles or slings dependent on their

size and construction.

2.3 Lifting

Pumps and motors often have integral

lifting lugs or eye bolts. These are intended for use in

only lifting the individual piece of equipment.

Do not use eye bolts or cast-in lifting

lugs to lift pump, motor and baseplate assemblies.

To avoid distortion, the pump unit

should be lifted as shown.

Care must be taken to lift components

or assemblies above the center of gravity to prevent

the unit from flipping. This is especially true with

In-Line pumps.

2.3.1 Lifting pump components

2.3.1.1 Casing [1100]

Use a choker hitch pulled tight around the discharge

nozzle.

2.3.1.2 Rear cover [1220]

Insert an eye hook in the drilled and tapped hole at

the top of the cover. Use either a sling or hook

through the eye bolt.

2.3.1.3 Bearing housing [3200]

Group 1: insert a sling between the upper and lower

support ribs between the housing barrel and the

casing attachment flange. Use a choker hitch when

slinging. (Make sure there are no sharp edges on the

bottom side of the ribs that could cut the sling.)

Group 2 and 3: insert either a sling or hook through

the lifting lug located on the top of the housing.

2.3.1.4 Power end

Same as bearing housing.

2.3.1.5 Bare pump

Horizontal pumps: sling around the pump discharge

nozzle and around the outboard end of the bearing

housing with separate slings. Choker hitches must be

used at both attachment points and pulled tight. Make

sure the completion of the choker hitch on the discharge

nozzle is toward the coupling end of the pump shaft as

shown in figure 2-1. The sling lengths should be adjusted

to balance the load before attaching the lifting hook.

Figure 2-1

In-Line pumps

:

lift with two slings through the pump

adapter on opposite sides of the shaft. (Figure 2-2.)

Bare pump with motor adapter (In-Line only): lift with

two slings through the motor adapter shaft holes.

This method is also used to lift the bare motor

adapter. (Figure 2-2.)