Installing the control – VistaQuest N7227V5 User Manual

Page 11

Advertising
background image

– 11 –

Section 2. INSTALLING THE CONTROL

This section provides instructions for mounting the control cabinet, and
installing the cabinet lock (if used). Also included in this section are instructions
for the following:

Installing the main PC board (and 4204 Relay Unit, if used).

Mounting the RF Receiver board (if used) in the cabinet.

Standard phone line connections.

Installing the back-up battery in the cabinet.

Connecting the AC transformer.

Making earth ground connections.

Mounting the Cabinet

Mount the control cabinet to a sturdy wall using fasteners or anchors (not
supplied), in a clean, dry area which is not readily accessible to the general
public. Four mounting holes are provided at the back of the cabinet.

If an RF Receiver is being used and you intend to mount its PC board within
the cabinet, note the following:

Do not mount the cabinet on or near metal objects. This will de crease RF
range and/or block RF trans missions from wireless transmitters.

Do not locate the cabinet in an area of high RF interference (revealed by
frequent or pro longed lighting of the LED in the receiver after it is
operational). Random flicker is OK.

Installing the Lock (if used)

Use an Ademco No. N6277 Cam Lock and No. N6277–1 Push-On Clip
(Retainer Clip).
Note:

The cabinet can be closed and secured

without a lock by using 2

screws in the cover's edge.

CABINET DOOR BOTTOM

RETAINER
CLIP

RETAINER CLIP
(NOTE POSITION)

RETAINER
SLOTS

LOCKED

UNLOCKED

Figure 1. Installing the Lock

1. Remove the cabinet door.

It

is easily removable for
servicing and is easily re-
installed.

2. Remove the lock knockout

from the control cabinet
door. Insert the key into the
lock. Position the lock in the
hole making certain that the
latch will make contact with
the latch bracket when the
door is closed.

3. Hold the lock steady, and in -

sert the retainer clip into the
retainer slots. Position the
clip as illustrated in order to
permit easy removal.

Before installing the cabinet's contents, re move the metal cabinet knock-outs
required for wiring entry. Do not attempt to re move the knockouts after the
circuit board has been installed.

Installing the Control's Circuit Board Alone, or (if used), with a 4204 Relay Unit

Control's Circuit Board

1.

Hang two

long Red mounting clips (provided) on the raised cabinet tabs

(see Detail B in Fig. 2).

2.

Insert the top of the circuit board into the slots at the top of the cabinet.
Make sure that the board rests on the correct row (see Detail A in Fig. 2).

3.

Swing the base of the board into the mounting clips and secure the board
to the cabinet with the ac companying screws (see Detail B in Fig. 2).

Advertising