Dodge (‘03-05) – Banks Power Ford Trucks: (Diesel ’03 - 07 6.0L Power Stroke) Interface- PowerPDA Ford (03-09), Chevy (01-08), Dodge (03-07) User Manual

Page 8

Advertising
background image

8

96801 v.9.0

2.

The Docking Station has adhesive

tape applied to it at the factory. Prior

to removing the protective liner from

the tape, test fit the unit on the dash

as indicated in the appropriate photo.

Refer to the figure list above for

vehicle-specific mounting locations.

The Docking Station will fit the dash

contours only where shown in the

photos.

3.

After test fitting, remove the liner

from the adhesive tape on the back of

the Docking Station.

4.

carefully align and secure the

Docking Station to the dash in the

same location as it was test fit. Press

the Docking Station firmly against the

dash for one minute to ensure good

adhesion.
Vehicle specific instructions

follow.

For Dodge (‘03-05) proceed to step 5.

For Chevy/GMC (01-08) LB7-LMM

proceed to step 15.

For Dodge (‘06-07) proceed to step 15.

For Ford (’08-09) proceed to step 15.

For Ford (’03-’04) proceed to step 23.

For Ford (’05-07) proceed to step 32.
After completing the mounting

process, proceed to Section 4.

Dodge (‘03-05)

Note: The Docking Station must be

connected to the previously installed

Banks PowerPDA-compatible Six-Gun

tuner via an RJ12 cable. If your Six-Gun

tuner is not installed, refer to the Six-

Gun tuner owner’s manual to install

the tuner before proceeding.

5.

To route the RJ12 cable connecting

the Docking Station to the Six-Gun (see

Six-Gun owners manual for details),

you will need to unclip the knee panel

(See Figure 10) Pry and unclip as

needed to gain enough clearance to

route the cable behind the panel.

6.

Locate the RJ12 cable on your

Six-Gun wiring harness and pull

enough cable through to reach the

bottom of the Docking Station.

7.

Locate and remove the screw in

the dash panel above the hook as

shown in Figure 11.

8.

Remove the dash panel by gently

pulling and unclipping it as needed.

(See Figure 12).

9.

Guide the RJ12 cable through the

clearance between the removed panel

and the dash as shown in Figure 13.

10.

Looking at the back of the dash

panel, locate the screw for the dash

plate as shown in Figure 15. This

panel may be blank, or contain the

airbag deactivation switch. Remove

the screw and the plate.

11.

Route the RJ12 cable through

the opening and connect it to the left

most receptacle on the bottom of the

Docking Station. Replace the dash

plate and screw.
Warning: The charging cable on

the Docking Station is designed

to supply a constant low-voltage

power source (+5VDC) to the

Banks PowerPDA and is “live”

as long as the system’s oBD II

interface cable is completely

installed and the RJ12 connector

is plugged into the Docking

Station. Although this charging

cable is short and its circuitry

is fuse-protected, the user is

expected to take appropriate

measures to prevent small

children and/or pets from contact

with any part of this system.

12.

Refit the dash panel and knee

panel by carefully snapping them back

into place. Tuck any excess cable

behind it for a clean appearance.

See Figure 14.