Banks Power Jeep Trucks: (Gas ’91 - 06 Wrangler 4.0L) Sidewinder Jeep Turbo Jeep 4.0L I-6 models '05-06 User Manual

Page 15

Advertising
background image

96312 v.2.0

15

misaligned inside the housing,

as in Figure 16. Using damaged

catalytic converters may cause

catastrophic damage to engine

and/or turbo system.

6.

With “Y” pipe removed, measure

3 ¹/₄” from where welds join together.
Place a hose clamp around exhaust at
mark and use permanent marker to
create a line that will ensure a square
cut. Remove clamp. See Figure 17

7.

Cut exhaust on mark with pneu-

matic reciprocating saw. Take care
while cutting and beware of surround-
ing components.

!

CAUTION: Use eye and ear

protection while cutting.

8.

Remove oil pan by removing

all bolts. Note stud location for rein-
stallation.

⁷/₁₆" deep socket and extension

9.

Inspect oil pan gasket. Replace if

damaged or clean if reusable.

Turbocharger Oil Return

1.

Thoroughly clean oil pan in prep-

aration for welding. Scrape flange to
remove any silicone or gasket mate-
rial.

2.

Mark location for oil return bung.

Measure

2 ¹/₄

” from front edge and

³/₄” from top edge. Use a center punch
to mark oil pan once location is deter-
mined. See Figure 18

3.

Use a stepped drill bit to drill a

⁵/₈” hole in oil pan at marked location.

4.

Deburr edge of hole and prepare

oil pan for welding by using a wire
brush to remove paint around hole.

5.

Center oil return bung on drilled

hole and weld around outer edge.

!

NOTE: If you are not an expe-

rienced welder, take the oil pan

to your local welding shop to

have it welded by a qualified

welder.

6.

Clean weld with a wire brush and

inspect for imperfections that may
cause it to leak. Prime and paint raw
metal to prevent rust and corrosion.
Plug bung to protect threads during
painting.

7.

Using thread sealant, install 45º

brass fitting (P/N 92177) into oil return
bung on oil pan. Position as shown in
Figure 19.

8.

Clean gasket surfaces of oil pan

and engine block. Apply silicone seal-
ant to rear main bearing cap corners
and engine block to front cover joints.
See Figure 20

9.

Hold gasket and oil pan in posi-

tion, install all ¼” bolts and torque to 7
lb-ft. Install four

⁵/₁₆"

bolts and torque

to 11 lb-ft.

10.

Install oil pan drain plug. Torque

to 25 lb-ft.

11.

Install oil drain hose (P/N 94203)

from turbocharger to 45º brass barb
with two spring clamps (P/N 92878).

Figure 17

Figure 19

Figure 20

Figure 18

Advertising