Banks Power Jeep Trucks: (Gas ’91 - 06 Wrangler 4.0L) Sidewinder Jeep Turbo Jeep 4.0L I-6 models '05-06 User Manual

Page 17

Advertising
background image

96312 v.2.0

17

Boost Tube

1.

Install 90º brass barb (P/N 92122)

and pipe plug (P/N 92251) into boost
tube (P/N 42452) with thread sealant.
Install stock IAT sensor into boost
tube. See Figure 26

Figure 26

2.

Install small end of boost tube

using hose coupler (P/N 94253) at
turbo with hose clamps (P/N 92850),
Install large end using hose coupler
(P/N 94276) at throttle body with hose
clamps (P/N 92855). Connect IAT sen-
sor connector.

3.

Connect free end of BOV refer-

ence line to BOV barb with spring
clamp (P/N 92775). Use cable ties to
secure line to avoid hot or moving
parts.

4.

Install wastegate actuator refer-

ence line (P/N 94123) by pushing it
onto 90º brass barb on boost tube and
on to wastegate actuator barb. Use
cable ties to secure line to avoid hot
or moving parts.

Ram-Air

®

Intake &

Super-Scoop

®

!

NOTE: Installing the Ram-Air

®

Intake & Super-Scoop

®

requires

that you cut a hole in your

hood. The Banks Sidewinder

®

Turbo System can be run with-

out the Super-Scoop

®

; however

the performance of the Banks

Sidewinder

®

Turbo System will

suffer and cannot be guaranteed.

1.

Cover entire turbo with clean rag.

Cover any other open ports or electri-
cal connectors.

2.

Use scissors to carefully cut

provided template on reference lines

labeled bottom of hood and edge of
hood latch.

!

NOTE: Edge of Hood Latch

Reference Line refers ONLY to

OEM hood latches!

3.

Position template on hood by

aligning bottom of hood reference
line with bottom edge of hood. Then,
align edge of hood latch reference line
with left side of hood latch. Ensure the
upper and lower hood crease refer-
ence lines are aligned with crease in
side of hood and adjust if necessary.
Use masking tape to hold template in
place. See Figure 27

4.

Use a center punch to mark four

Figure 25

Figure 27

Figure 28

Advertising