Figure #12, Stiffener installation & location – Grain Systems PNEG-366 User Manual

Page 14

Advertising
background image

Grain Systems, Inc. Assumption, Ill.

14

18' Autoflow

FC-4207516 16 GA.

BLUE

FC-4207518 18 GA.

ORANGE

FC-4207516 16 GA.

BLUE

FC-4207518 18 GA.

ORANGE

3/8" DIA. HEX FLANGED
HEAD BOLT (NO
SEALING WASHER)

USE 3/8" X 1.1/2"

BOLT, NUT AND WASHER

SPLICE PLATE JOINT

(TOP VIEW)

OFFSET JOINT CONNECTION

DETAIL

FC-4206308 8 GA.

YELLOW

FC-42062 10 GA.

PURPLE

FC-42076 SPLICE

3/8" DIA. HEX FLANGED
HEAD BOLT (NO
SEALING WASHER)

Figure #12

When installing bottom stiffeners, you may find that in some cases the stiffener with base plate attached

will not rest on the foundation (due to unlevel concrete, etc.) Shim plates have been furnished and should be
used to fill opening between base plate and concrete.

IMPORTANT: If shim plates are not used where required, the downward pressure of the stiffeners will

not be transferred directly to the foundation, and bin failure could result.

STIFFENER INSTALLATION & LOCATION

REV. 11-20-96

Advertising