LEVELING BAND POST INSTALLATION
Install the leveling band posts on the floor as shown in Figure #26.
The second and sixth holes in the beam indicate the location of the leveling band posts. Attach posts with
5/16" x 1.1/4" bin bolts (S-277). In the second hole from the bottom of the sheet, there will be 6 posts (1
every third sheet). In the sixth hole there will be 6 posts (1 every third sheet). After all of the posts have
been installed fill the unused holes with 5/16" x 1.1/4" bin bolts.