Grain Systems PNEG-366 User Manual

Page 31

Advertising
background image

31

18' Autoflow

Grain Systems, Inc. Assumption, Ill.

REV. 11-20-96

Attach all 18 dump chute chains directly to the lift plate as shown in figure below.

Install all chains using "S" hooks (S-4692) to attach the chains to the dump chutes and lift plates. Keep excess

chain at the lift plate. Adjust the chains until the chutes are approximately level when the lift plate is in the closed

(up) position. Once the chains are uniformly adjusted, crimp the "S" hooks closed. Check when attaching the "s"

hook to the end link on a chain that the end has not been cut open. If this is found remove the end link or shift up

and use the next link in chain.

DUMP CHUTE CHAIN ASSEMBLY

Chain leading to outer chutes

(82") Adjust length as required

TD-100205

Center Lift Plate

(TD-100801)

Chutes in closed position

Crimp "S" hooks after

final chute adjustment

Cable Clamp

S-4693

Loop in Cable

Center Collar

Cross Brace

Lift Plate

To sidewall pulley

assembly

12" when chutes are level(closed)

Figure #37

Advertising