Installation – Xylem IM250R03 Aquavar CPC-FD User Manual

Page 10

Advertising
background image

10

Mount the Drive
R7…R8

1. Use a hoist to move the cabinet into position.

NOTE! If the cabinet location does not provide access to the cabinet
sides, be sure to re-mount side panels before positioning cabinet.

2. Install and tighten mounting bolts.

Installing the Wiring (Supplement to Aquavar CPC User’s Manual)

WARNING!

• Metal shavings or debris in the enclosure can damage electrical equipment and create a

hazardous condition. Where parts, such as conduit plates require cutting or drilling, first
remove the part. If that is not practical, cover nearby electrical components to protect
them from all shavings or debris.

• Do not connect or disconnect input or output power wiring, or control wires, when power

is applied.

• Never connect line voltage to drive output Terminals T1, T2 and T3.
• Do not make any voltage tolerance tests (Hi Pot or Megger) on any part of the unit.

Disconnect motor wires before taking any measurements in the motor or motor wires.

• Make sure that power factor correction capacitors are not connected between the drive

and the motor.

Wiring Requirements
Refer to the “Wiring Requirements” Section in the Aquavar CPC User’s Manual. The
requirements apply to all Aquavar CPC drives. In particular:

• Use separate, metal conduit runs for the following different classes of wiring:

– Input power wiring
– Motor wiring
– Control/communications wiring

• Properly and individually ground the drive, the motor and cable shields.
Ground the pressure transducer or piping back to the Aquavar chassis or common

grounding point.

PC00003

30º

INSTALLATION

Advertising