Installation, Installation flow chart – Xylem IM250R03 Aquavar CPC-FD User Manual

Page 6

Advertising
background image

6

Installation Flow Chart

The installation of Input Disconnect configurations for Aquavar CPC drives follows the outline
below. The steps must be carried out in the order shown. At the right of each step are refer-
ences to the detailed information needed for the correct installation of the unit.

NOTE! References in the middle column below are to the Aquavar CPC User’s Manual
(IM167). References in the third column below are to this manual.

Refer to the

Additional Reference

Task

Aquavar CPC User’s Manual

in this Manual

“Installation” Section

PREPARE

for

“Preparing for Installation”

• R7/R8: “Lifting the Drive”

installation

on page 7.

• “Drive Identification” on page 8.

• “Suitable Mounting Location”

on page 9.

PREPARE

the

“Prepare the Mounting Location”

• R7/R8: “Prepare the Mounting

Mounting

Location – R7 and R8” on

Location

page 9.

• “Dimensions and Weights

(Supplement to Aquavar CPC

User’s Manual)” on page 27.

REMOVE

the

“Remove Front Cover”

R7/R8: “Remove Side Panel- R7 and

front cover

R8 NEMA 1 and 12 Enclosures” on

page 9.

MOUNT

the drive

“Mount the Drive”

R7/R8: “Mount the Drive” on

page 10.

INSTALL

wiring

“Wiring Overview” and

“Installing the Wiring (Supplement

“Install the Wiring”

to Aquavar CPC User’s Manual)”

starting on page 10.

CHECK

installation

“Check Installation”

REINSTALL

the

“Reinstall Cover”

cover

APPLY

power

“Apply Power”

START-UP “Start-Up”

INSTALLATION

Advertising