3 commissioning, 1 scope of delivery, 2 initial commissioning – Xylem Lab 960 User Manual

Page 15: Commissioning, Scope of delivery, Initial commissioning, 3commissioning

Advertising
background image

Lab 960

Commissioning

15

ba75557e05

11/2009

3

Commissioning

3.1

Scope of delivery

z Lab 960 laboratory meter

z Power pack

z 4 batteries 1.5 V Mignon type AA

z Z875 USB cable with A plug on B plug

z Transparent cover

z Operating manual

z CD-ROM with USB driver

3.2

Initial commissioning

Perform the following activities:

z Insert batteries

z Switch on the meter

z Set the date and time

z Connect the power pack (for line power operation only).

Insert batteries

1

Open the battery compartment (1) on the underside of the
meter.

2

Place four batteries (type Mignon AA) in the battery
compartment.

3

Close the battery compartment (1).
The date (day) flashes in the display.

4

Set the date and time according to page 43.

Advertising