3 commissioning, 1 scope of delivery, 2 initial commissioning – Xylem Lab 960 User Manual
Page 15: Commissioning, Scope of delivery, Initial commissioning, 3commissioning
Advertising

Lab 960
Commissioning
15
ba75557e05
11/2009
3
Commissioning
3.1
Scope of delivery
z Lab 960 laboratory meter
z Power pack
z 4 batteries 1.5 V Mignon type AA
z Z875 USB cable with A plug on B plug
z Transparent cover
z Operating manual
z CD-ROM with USB driver
3.2
Initial commissioning
Perform the following activities:
z Insert batteries
z Switch on the meter
z Set the date and time
z Connect the power pack (for line power operation only).
Insert batteries
1
Open the battery compartment (1) on the underside of the
meter.
2
Place four batteries (type Mignon AA) in the battery
compartment.
3
Close the battery compartment (1).
The date (day) flashes in the display.
4
Set the date and time according to page 43.
Advertising