Xylem Lab 960 User Manual

Page 76

Advertising
background image

Lab 960

76

ba75557e05

11/2009

After switching the meter off and on you can check whether the meter
has taken over the new software version (see page 62).

4

To go on, follow the instruction of the program.
During the programming process, a corresponding message
and a progress bar (in %) appear.
The programming process takes approx. two minutes.
A terminatory message is displayed after a successful
programming process. The firmware update is now completed.

5

Disconnect the meter from the PC.
The instrument is ready for operation.

Advertising