Mbsdu panel mounting/preparation, 3 mbsdu panel mounting/preparation – Alpha Technologies INEX Inverter System User Manual

Page 17

Advertising
background image

Argus Technologies Ltd.

014-114-C0 Rev D WC

Printed in Canada. © 2008 Argus Technologies Ltd. ARGUS and INEX are registered trademarks of Argus Technologies Ltd. All Rights Reserved.

Page 7 of 43

3.3

MBSDU Panel Mounting/Preparation

The panel has been designed for flush or mid-mounting in a 19” relay rack. Mounting brackets are also supplied
for mounting in a 23” rack.

NOTE:

The panel shall be mounted in a clean and dry environment.

1. The panel should be mounted to the rack using at least two #12

– 24 x 1/2” screws in each bracket. Philips-type screws and
screwdriver should be used to eliminate the possibility of
slippage and scratching of the unit’s exterior. Washers (such as
internal tooth) or special screws that are designed to cut through
the painted surface should be used to ensure a good chassis
ground.

2. Put the panel into the equipment rack horizontally, and align

holes of mounting brackets and rack. The panel must be
mounted above the controller/interface/STS shelf.

3. All input and output connections are made through the knockouts, located in the bottom of the rear cover and

both side panels. To remove knockout, snip tabs, move plate up and down until tabs in back snap apart.

4. Remove the rear cover to access the backplane and connectors.

Advertising