Q.V.P. EP5 - Continuous Flow Veneering User Manual
Quality vakuum products, inc, Ep5 super-pro manual set-up diagram, Vakuum bag or frame press veneering
EP5 SUPER-PRO MANUAL SET-UP DIAGRAM
continuos flow
VAKUUM BAG OR FRAME PRESS VENEERING
1.)
Screw the filter/gauge assembly onto the Electric Pump.
CAUTION:
Do not use the filter as leverage to tighten the
assembly, as it may break. Use a wrench on the brass fittings to
tighten the assembly.
2.)
Attach the long clear piece of tubing from the filter assembly to the
VCA6 (VAKuum Connector Assembly) on the bag or press. Refer to
Instructions for Assembling the VAKuum Bag for details.
3.)
If you are using an optional Foot Pedal connect the pump to the pedal
and the pedal to the electric outlet. The pedal is an On/Off switch for
the pump.
Filter
Electric Pump
Foot Pedal
(Optional)
4/1/98 - EP5 Manual VB&FP Veneering.cdr
Gauge
1/2“ I.D.
Tubing
Electric
Outlet
VAKuum Bag
or
Frame Press
VCA6
R
Quality VAKuum Products, Inc.
Or visit our site at
www.qualityvak.com
CALL 1-800-547-5484 TODAY!
Remove orange plastic plug and screw in filter assembly.
74 Apsley St. - Hudson, MA 01749
Tel: 978-562-4680 - Fax: 978-562-4681