7 appendix b – wiring diagram 21.84, Appendix b – wiring diagram 21.84 – Castle TSM-21 Diagnostic Manual User Manual

Page 57

Advertising
background image

Castle Inc

TSM-21 Diagnostic Manual v2

Page 57 of 63

7 Appendix B – Wiring Diagram

21.84

14
13
12
11
10

9
8
7
6
5
4
3
2
1

Drill Solenoid Valve

Clamp Solenoid Valve

Drill Stop Switch

(NC-Normally Closed)

Router Solenoid Valve

Foot Switch

(NO-Normally Open)

Router Stop Switch

(NC-Normally Closed)

15/16

EL-21G Circuit Board Term

inal Strip

16
15

Wood Sensor Switch

(NO-Normally Open)

13/14

11/12

9/10

7/8

5/6

3/4

D

Black

Power Switch

White

Green

Power

Cord

24 VAC

Transformer

120VAC

System Groun

d

F

oo

t Sw

itch

G

roun

d

Outlet

+24 VD

C

Advertising