2 installation check list, Installation – Hach-Lange ORBISPHERE Model 51x User Manual User Manual

Page 24

Advertising
background image

22

Installation

3.2 Installation check list

To complete the installation, proceed to the following actions:

1.

Follow the installation instructions in this section carefully.

2.

On completion, verify once more that everything is properly connected.

3.

If using the instrument with a TC sensor it is very important to ensure the purge gas supply
has been connected properly and has been turned on.

4.

Turn the instrument on.

5.

Set the language.

6.

Set the security levels, users ID’s and passwords.

7.

Configure the instrument and measurement channels.

8.

If not using an external pressure sensor make sure the option is disabled (see

Advanced

configuration - EC sensor on page 55

).

9.

Perform a barometric sensor calibration.

10.

Perform an external pressure calibration (optional).

11.

Perform the gas sensor(s) calibration.

12.

Perform any interference calibrations.

13.

Set the alarm thresholds.

The instrument should now be ready for operation. If a problem should arise, please refer
initially to

Troubleshooting on page 105

. If the difficulty cannot be overcome, please contact

your Hach Lange representative who will be happy to assist you.

Advertising