Sequence of operations on the measuring instrument – Hach-Lange LUMISTOX 300 LPV321 User Manual User Manual

Page 15

Advertising
background image

LUMIStox 300 Operating Manual

Dr. Bruno Lange GmbH

______________________________________________________________________________

______________________________________________________________________________

Page: 15

Sequence of operations on the measuring instrument:

Left and centre-left:

Centre-right:

Right:

Enter initial settings.

Measuring the initial luminescence,

Record or print

and addition of sample at specified

results.

intervals. After the incubation period,

measurement of final luminescence

at specified time intervals.

scrn EC GL

reference check

please wait

settings
change ? Y

N

dilution steps

?

4

ok

pre dilution.:no
yes no

type of dil.:DIN
DIN

2

ok

time of incub. 1

?

30

ok

time of incub. 2

?

0

ok

12

.B1 measure

B1= 702.2

9

.C1 measure

inc. time left 1

00:10:04

6

:B1 measure

B1= 723.6

9

:C1 measure

..

.

..

.

GL = 6

rslt

fk = 1,03

rslt

GL

480 490

GL

482 492

GL

491 4xx

Advertising