Sequence of operations on the measuring instrument – Hach-Lange LUMISTOX 300 LPV321 User Manual User Manual
Page 17

LUMIStox 300 Operating Manual
Dr. Bruno Lange GmbH
______________________________________________________________________________
______________________________________________________________________________
Page: 17
Sequence of operations on the measuring instrument:
Left and centre-left:
Centre-right:
Right:
Enter initial settings.
Measuring the initial luminescence,
Record or print
and addition of sample at specified
results.
intervals. After the incubation period,
measurement of final luminescence
at specified time intervals.
scrn EC GL
EC 20/50
480 490
EC 20/50
482 492
EC 20/50
491 4xx
reference check
please wait
settings
change? Y
N
dilution steps
?
4
ok
pre dilution : no
yes no
ok
type of dil.:DIN
DIN
2
ok
unit :
mg/l
mg/l g/l %
ok
ini.conc. in mg/l
? 100.0
ok
time of incub. 1
? 15
ok
time of incub. 2
? 30
ok
time of incub. 3
?
0
ok
12
.B1 measure
B1= 702.2
9
.C1 measure
6
:B1 measure
B1= 723.6
9
:C1 measure
..
.
..
.
1
EC50
= 29.20 mg/l
rslt
1
EC20
= 11.57 mg/l
rslt
1 fk = 1,03
rslt
inc. time left 1
00:10:04
..
.
2
EC50
= 29.20 mg/l
rslt
2
EC20
= 11.57 mg/l
rslt
2 fk = 1,03
rslt