Installation – Fulton Vertical Coil (FT-C_S) Thermal Fluid (hot oil) Heater User Manual

Page 39

Advertising
background image

Questions? Call (315) 298-5121, or visit us online at www.fulton.com

SECTION 2

FTCS-IOM-2013-1114

INSTALLATION

2-33

rated for a 1200°F (649°C) operating temperature.

6. Ensure the stack and chimney material complies with all

applicable codes.

7. Make adequate provisions for the support of the

weight of the chimney and stack to avoid having a load
imparted to the outlet connection of the equipment.

8. Ensure the draft, when fi ring, is negative and constant.

A reading of -0.02 to -0.04”wc when the unit and stack

are cold usually indicates suffi

cient draft. When the unit

is running and the stack is hot, the draft should read 0.04
to 0.08 “wc negative.

9. The installation of a draft regulator by the client/

contractor should be considered at all installations,
and installed if necessary. This will help to maintain the
required draft. The placement of the draft regulator
should be as shown in Figure 19.

10. Insulate the section of the chimney duct within

Roof

Minimum

6' Above

Any Structure

Within 30'

Support As

Necessary

Install
Appropriate
Weather
Cap

Horizontal
Run 2'

Draft Regulator

Draft Regulator

Expansion Joints
As Required

Horizontal
Run 2'

60°

(45° Min.)

Cleanout

Door

Cleanout

Door

Cleanout

Door

This Distance
Must Not
Exceed 70%
Of Total Rise

Baffle

3'

3'

30°

Max

Stagger

Entrances

A

A

A-A

Total

Rise

FIGURE 18 - TYPICAL STACK AND FLUE INSTALLATION