4 installation of the load – IAI America RCA2-SA6R User Manual

Page 57

Advertising
background image

49

9. Installation

9.4

Installation of the Load

Please attach the load to the device using the tap holes in the slider.
The process for attaching these to the main unit is similar to the installation process of the main
unit. Use of high-tension bolts meeting at least ISO-10.9 standard is recommended for mounting.
The table below shows the recommended tightening torque.
There are two reamed holes on the slider, so if you need to be able to secure and detach the load
multiple times, please use these holes. Also, if you require precision in your attachment, such as a
right angle, use one of the reamed holes to make fine adjustments.
*

When using reamed holes, we recommend using an H7 pin. Also, do not force the pin into
the hole. Instead, press it gently in until it fits.

For exact thread depth and reamed hole depth, please see the table below.

Do not tighten the mounting screws to a torque beyond the applicable torque specified in the table
below. Doing so may damage the tapped holes.

Mounting bolt

Model

A

B

C

D

E

Nominal thread size

Tightening torque

SA3

17

11

17

2H7,

depth 5

M3 D6

M3

0.83 N-m

(0.085 kgf-m)

SA4

20

14

21

2.5H7,

depth 5

M3 D6

M3

0.83 N-m

(0.085 kgf-m)

SA5

26

14

22

2.5H7,

depth 5

M4 D8

M4

1.76 N-m

(0.18 kgf-m)

SA6

31

15

25

3H7,

depth5

M5 D10

M5

3.42 N-m

(0.35 kgf-m)

A

reamed

pit

c

h:

0.02)

RCA2-SA3C/SA4C/SA5C/SA6C/SA3R/SA4R/SA5R/SA6R

RCA2-SA2AC/SA2AR

15 (Reamer pitch tolerance

p0.02)

10

3

3

3

12

7.5

5

7.5

4-M2, Depth 4

2-

F2H7, Depth 2

Advertising
This manual is related to the following products: