Figure 4-11: backplane retention screws – IEI Integration EC-1040G User Manual

Page 45

Advertising
background image

EC-1040GB Workstation

Page 35

Step 2:

Mount the backplane into the chassis. Make sure the backplane is positioned so

that when the CPU card and PCI/ISA expansion cards are installed, both the

CPU card and the PCI/ISA card I/O connectors face the I/O brackets on the rear

panel.

Step 3:

Align the retention screw holes in the backplane with the copper pillars installed

in Step 1.

Step 4:

Insert retention screws to secure the backplane to the chassis (Figure 4-11)

Figure 4-11: Backplane Retention Screws

Advertising