4. INSTALLATION

4.4 Changing the Direction of

Integral Indicator

IMPORTANT

Always turn OFF power, release pressure and
remove a transmitter to non-hazardous area
before disassembling and reassmbling an
indicator.

An integral indicator can be installed in the following
three directions. Follow the instructions in section 9.4
for removing and attaching the integral indicator.

F0404.EPS

Figure 4.3

Integral Indicator Direction

4.5 Affixing the Teflon Film

IMPORTANT

The FEP Teflon option includes a teflon film and

fluorinated oil. Before mounting the transmitter
to the process flange, affix the teflon film as
follows:

1) Position the diaphragm so that the diaphragm

is in a upward position.

2) Pour the fluorinated oil on the diaphragm and

gasket area covering it completely and evenly.
Be careful not to scratch the diaphragm or
change the its shape.

3) Affix the teflon film over the diaphragm and

gasket area.

4) Next, carefully inspect the cover and try to

identify any entrapped air between the dia-
phragm and the teflon film. The air must be
removed to ensure accuracy. If air pockets are
present, use your fingers to remove the air by
starting at the center of the diaphragm and
work your way out.

5) Place the gasket with the teflon film and affix

to the process flange.

Teflon film

Diaphragm

Fluorinated oil

[PART No. : F9145YN]

Gasket area

PART No.

F9347XA

F9347YD

Prosess Flange size

3 inch (80mm)

2 inch (50mm)

F0403.EPS

Figure 4.4 Affixing the Teflon Film