Caution, Pvcheck – HT instruments PVCHECK User Manual
Page 18

PVCHECK
EN - 16
5.3. LOW
– SETTINGS FOR CONTINUITY TEST WITH 200MA
The purpose of this measurement is to test the continuity of protective conductors and
equipotential ones (e.g. from rod to earth and connected foreign earth) and earth rods of
SPDs on PV installations. The test must be carried out using a test current > 200mA
according to the prescriptions of IEC/EN62446 guideline
5.3.1. Instrument settings
1. Position the cursor onto LOW
by using the arrow keys
(
,) and confirm with ENTER. The display shows the
following screen:
15/05/12 15:34:26
R P E m a x
:
1
R c a l
:
- - -
R p e
=
- - -
I t e s t
=
- - -
m A
Selection
L O W
2. Press the ENTER key. The instrument shows the
following options: Settings and Leads calibration
3. Use the arrow keys (
,) to select “Settings” and
confirm with ENTER. The instrument shows the following
screen:
15/05/12 15:34:26
R P E m a x
:
1
R c a l
:
- - -
R p e
=
- - -
I t e s t
=
- - -
m A
Leads calibration
S e t t i n g s
Selection
L O W
4. Using the arrow keys (
, ) it is possible to set the
maximum limit value of Rpe resistance which the
instrument uses as a reference while measuring.
5. Press the SAVE key to save the settings made; the
message “Data saved” will be displayed for a few
seconds. Press the ESC/MENU key to exit without saving
and go back to the previous screen.
15/05/12 15:34:26
R P E m a x : 0 1
S A V E t o s t o r e
Selection
L O W
CAUTION
The settings saved for max RPE also affect the settings for the Continuity test
contained in the IVCK measurement (MENU
IVCK)