Installation, General directions, Installation considerations – Badger Meter Registers User Manual

Page 23: Installation 23

Advertising
background image

User Manual

INSTALLATION

General Directions


• MOUNTING, ELECTRICAL INSTALLATION, START-UP AND MAINTENANCE OF THIS INSTRUMENT MAY ONLY BE CARRIED

OUT BY TRAINED PERSONNEL AUTHORIZED BY THE OPERATOR OF THE FACILITY. PERSONNEL MUST READ AND

UNDERSTAND THIS MANUAL BEFORE CARRYING OUT ITS INSTRUCTIONS.

• THE ER-420 MAY ONLY BE OPERATED BY PERSONNEL WHO ARE AUTHORIZED AND TRAINED BY THE OPERATOR OF THE

FACILITY. ALL INSTRUCTIONS IN THIS MANUAL ARE TO BE OBSERVED.

• ENSURE THAT THE MEASURING SYSTEM IS CORRECTLY WIRED UP ACCORDING TO THE WIRING DIAGRAMS.

PROTECTION AGAINST ACCIDENTAL CONTACT IS NO LONGER ASSURED WHEN THE HOUSING COVER IS REMOVED OR

THE PANEL CABINET HAS BEEN OPENED (DANGER FROM ELECTRICAL SHOCK). THE HOUSING MAY ONLY BE OPENED BY

TRAINED PERSONNEL.

• TAKE CAREFUL NOTICE OF

"Safety" on page 5

.

Installation Considerations

• Take the relevant IP classification of the casing into account (see manufacturer's plate) Even an IP67 (NEMA 4X) casing

should NEVER be exposed to strongly varying weather conditions

• When panel-mounted, the unit is IP65 (NEMA 4)
• When used in very cold surroundings or varying climatic conditions, take the necessary precautions against moisture by

placing a dry sachet of silica gel, for example, inside the instrument case

Mount the ER-420 on a solid structure to avoid vibrations

Page 23

May 2014

Advertising