Revolution, Terminal block connections, You are now ready to fill and power up the spa – Balboa Water Group Revolution User Manual
Page 21: Transforming the control of hot tubs, 230v wiring installation

Revolution
Transforming the Control of Hot Tubs
21
Manufactured under one or more of these patents. U.S. Patents: 5332944, 5361215, 5550753, 5559720, 5,883,459, 6253227, 6282370, 6590188, 6976052, 6965815, 7030343, 7,417,
834 b2, Canadian Patent: 2342614, Australian patent: 2373248 other patents both foreign and domestic applied for and pending. All material copyright of Balboa Water Group.
F3 10A 250V
F2 3A 250V
F6 0.3A 250V
J44
J24
J45
J15
W5
W4
J13
J16
J27 J25 J26 J23 J33
J28 J30 J31 J32 J29
J12
J46
J20
J57
J8
J14
J22
J21
J56
F5 30A
GND
K3
K5
K6
K2
K1
K4
K8
P2 / BL
PUMP 1
OZONE
CIRC
22117_A
RED AC
GND
GND
WHT AC
HTR
A
HTR
B
J45
J46
J24
F4 1A 250V
J18
J19
K7
T1
J15
J33
S1
S6
J31 HCE
J30 TST
J27
H3
J22
J26 H2
J25 H1
J17
J16
J29 VAC
J28 AUX FRZ
J5
LIGHT
ON
22112_A
L2
L1
N
GFCI
GND
Terminal Block Connections
Tools Needed: Phillips and flat screwdrivers, wire strippers.
Remove the four screws holding the system lid.
1.
Attach the conduit or wire connector to the system box.
2.
Strip away 1”of insulation of each wire.
3.
Pull the cable through the access hole.
4.
Push the wires into the proper terminals as indicated on the terminal
5.
block sticker.
Connect the ground wire to the Bond Lug ground bar through the hole in
6.
the system box and tighten the screw.
Tighten the screws on the terminal block; torque between 21 and 23 in lbs.
7.
TIP
When installing and routing wires to the terminal block, providing service loops
to incoming wiring is highly recommended. Service loops provide an extra
length of wire in the event of future serviceability.
You are now ready to fill and power up the spa.
Bond Lug
for
Spa Equipment
Main Electrical Connections
In BP1500 System
F3 10A 250V
F2 3A 250V
F6 0.3A 250V
J44
J24
J45
J15
W5
W4
J13
J16
J27
J25
J26
J23
J33
J28
J30
J31
J32
J29
J12
J46
J20
J57
J8
J14
J22
J21
J56
F5 30A
GND
K3
K5
K6
K2
K1
K4
K8
P2 / BL
PUMP 1
OZ
ONE
CIRC
22117_A
RED AC
GND
GND
WHT AC
HTR
A
HTR
B
J45
J46
J24
F4 1A 250V
J18
J19
K7
T1
J15
J33
S1
S6
J31 HCE
J30 TST
J27
H3
J22
J26 H2
J25 H1
J17
J16
J29 VAC
J28 AUX FRZ
J5
LIGHT
ON
22112_A
L2
GND
L1
N
240V Wiring Installation
120V Wiring Installation
L2
L1
N
F3 10A 250V
F2 3A 250V
J44
J48
J1
J2
J24
J45
J49
J15
J16
J47
J13
J27
J25
J26
J23
J33
J28
J30
J31
J32
J29
J12
J46
J20
J57
J8
J14
J22
J21
J56
GND
K3
K5
K6
K2
K1
K4
OZ
ONE
22117_B
RED AC
GND
GND
WHT AC
HTR A
HTR B
UNFUSED
T 150 m A
250V
F5 T 30A
CIRC
1S PUMP 1
1S PUMP 2
GRN
N
L1
N/A
ADDED JUMPER FOR
CE INSTALLATIONS
BLU
BRN
230V Wiring Installation