Revolution, Configuration setup 7 & 8, 120 v – Balboa Water Group Revolution User Manual

Page 61: Transforming the control of hot tubs, 1s1 6, J29 to j33 jumper, Onfiguration, Gfci, 0 kw @ 120 vac

Advertising
background image

Revolution

Transforming the Control of Hot Tubs

61

Manufactured under one or more of these patents. U.S. Patents: 5332944, 5361215, 5550753, 5559720, 5,883,459, 6253227, 6282370, 6590188, 6976052, 6965815, 7030343, 7,417,

834 b2, Canadian Patent: 2342614, Australian patent: 2373248 other patents both foreign and domestic applied for and pending. All material copyright of Balboa Water Group.

Configuration Setup 7 & 8

120 V

OLT

C

ONFIGURATION

NOTE: The top logic board must be removed to gain access to the connections
on the power board.

All services will run at 120V when the jumper J29 - J33 is installed.

Power Board:

Voltage: 120V, 60Hz

Heater: 1

.0 KW @ 120 VAC

Logic Board:

S1 DIP switch No. 2: OFF

LED Spa Light (J15): 12 VAC 1.0 A Max.

1

S1

6

ON

Setup 7 & 8

Wiring changes:

Add Jumper J29 - J33 to change system to 120V.

F3 10A 250V

F2 3A 250V

F6 0.3A 250V

J44

J24

J45

J15

W5

W4

J13

J27 J25 J26 J23 J33

J28 J30 J31 J32 J29

J12

J46

J20

J57

J8

J14

J22

F5 30A

GND

K3

K5

K6

K2

K1

K4

K

P2 / BL

PUMP 1

OZONE

22117_A

RED AC

GND

WHT AC

HTR

A

HTR

B

J45

J46

J24

F4 1A 250V

J18

J19

K7

T1

J15

J33

S1

S6

J31 HCE

J30 TST

J27

H3

J22

J26 H2

J25 H1

J17
J16

J29 VAC

J28 AUX FRZ

J5

LIGHT

ON

22112_A

L2

L1

N

GFCI

GND

J29 to J33 Jumper

Setup

No.

Pump 1 (P1)

J8

Circ Pump

J21

Ozone

J22

S1 Switch

No. 2

Jumper 15

Connects To

7

2 SPD

NA

120V

OFF

J12

8

1 SPD

YES

120V

OFF

J12

L2

L1

N

F3 10A 250V

F2 3A 250V

F6 0.1A 250V

J44
J48

J1
J2

J24

J45

J49

J15

J16

J47

J13

J27

J25

J26

J23

J33

J28

J30

J31

J32

J29

J12

J46

J20

J57

J8

J14

J22

J21

J56

F5 30A

GND

K3

K5

K6

K2

K1

K4

OZ

ONE

22117_B

RED AC

GND

GND

WHT AC

HTR A

HTR B

UNFUSED

J45

J46

J24

F4 1A 250V

J18

J19

K7

T1

J15

J33

J31 HCE

J30 TST

J27

H3

J22

J26 H2

J25 H1

J17

J16

J29 VAC

J28 AUX FRZ

J5

LIGHT

ON

22121_C

CONTROL PANEL

TO J33

AUX

TO J5

1

6

S1

ALL UNUSED SWITCHES
SHOULD BE OFF

STORE SETTINGS*
SPECIAL AMPERAGE RULE OFF
DON’T ADD 4 HS PUMPS W/HTR
DON’T ADD 2 HS PUMPS W/HTR
DON’T ADD 1 HS PUMP W/HTR
TEST MODE OFF

MEMORY RESET*
SPECIAL AMPERAGE RULE ON
ADD 4 HS PUMPS WITH HEAT
ADD 2 HS PUMPS WITH HEAT
ADD 1 HS PUMP WITH HEAT
TEST MODE ON

6
5
4
3
2
1

ON POSITION

S1 SWITCH #

OFF POSITION

*SWITCH #

6 SHOULD BE SET TO OFF

UPON FINAL INSTALLATION.

SENSOR A

SENSOR B

NO

T USED

2S PUMP 1

1S PUMP 2NO

T USED

ADDED JUMPER FOR

120VAC HEATER SYSTEM

REMOVE FOR 240V HEATER

GRN

BLK

GFCI

1.0 kW

Advertising