Commissioning, operation – WIKA LSO.25 User Manual

Page 20

Advertising
background image

20

WIKA operating instructions models LSO.06, LSO.25

13334603.01 09/2010 GB/D/F/E

6. Commissioning, operation

GB

6. Commissioning, operation

Before the installation a check of the function can be carried out. The device attached

provisionally and the glass tip are one and from dived to this for the test in a glass with

liquid (adjustment if necessary, see chapter "7.2 Adjustment with CAL").

WARNING!

The electrical connection only be carried out by qualified skilled personnel.

Observe the appropriate VDE regulations.

6.1 Installation instructions transducer model LSO.06

The sensors may be installed in any direction, i. e. from top, bottom, sideways or inclined.

In some special applications it is recommended to use following hints:

High viscosity:

sideways or from bottom

Dry Running protection for pumps: if the pipes to or from the pump are installed

horizontally use top mounting for fast detection of

liquid

Overfill prevention devices:

usually vertically from above

Vertical installation

Installation model LSO.06 from top with flange

connection e. g. as overflow control.

Insertion length EL from sealing face flange

DIN flanges from DN25 PN6

ANSI flanges

The sealing forms are freely selectable

Explosion-protected version:

Flanges seal-welded with the transducer

sensor component

If seal-welded: no hexagon on sensor

component

Advertising
This manual is related to the following products: