WIKA operating instructions models LSO.06, LSO.25

25

13334603.01 09/2010 GB/D/F/E

6. Commissioning, operation

GB

6.4 Connection supply

First check, if the existing supply voltage agrees with the voltage version of the switching

amplifier should be checked first (see marking on the circuit board).

230 V ~

LSO.25-X1X

115/120 V ~

LSO.25-X2X

24 V ~

LSO.25-X3X

24 V =

LSO.25-X4X

24 V = without potential separation

LSO.25-X7X (only for standard)

At the plastic case version the line terminals "supply" is marked with the operating

voltage in addition and it is the connection to see directly from the imprint. Carry out the

connection in accordance with "Connection diagram transducer and switching amplifier"

on page 22.

Pin assignment of plug-in card

d 28 (c28) = N (-)

d 30 (c30) = L (+)

6.5 Connection relay

The signals "signal" and "failure" are provided for per a relay with change over contacts.

These are potential-free and can be used for every arbitrary application. At the mounting

case version the connections can be seen directly from the imprint on the pcboard.

Pin assignment of plug-in card

Failure

Signal

Contact

4/d18

1/d24

NO

5/d16

2/d22

NC

6/d14

3/d20

root

6.6 Function control

After wiring been carried out and checked the supply can be switched on. One of the

yellow LED's should come on now. By pressing the button "test" at closed switch S2 (time

delay turned off) one of the two yellow LED shines approx. 1 s. After this the other yellow

LED is flashing as long as the test button remains pressed. This shows that wiring and

switch amplifiers are all right. If this should not be the case, follow the justage instructions

see chapter "7.2 Adjustment with CAL".

Please observe the actions to be taken in the event of any faults that may

occur, see chapter "10. Troubleshooting".