Installation overview – Asante Technologies 5308F User Manual

Page 31

Advertising
background image

Installation Overview

Page 2-3

Installation

Overview

Table 2-1 describes the steps needed to install the IntraSwitch
5308FL.

The steps that are optional are labeled “optional”; the steps that
are required are labeled “required.” The sections that follow
explain each step in detail.

To install the IntraSwitch 5308FL:

Table 2-1 Installation Overview

Step

Action

1

(required)

Open the box and check the contents.

See “Package Contents” on page 1-8 for a
complete list of the items included with your
IntraSwitch 5308FL.

2

(required)

Install the IntraSwitch 5308FL in an equipment
rack or prepare it for desktop placement.

See “Rack Mounting/Desktop Placement” on
page 2-4.

3

(optional)

Install MII module(s), if any.

See “Installing MII Modules” on page 2-6.

4

(required)

Check the power connection.

See “Connecting Power” on page 2-8.

5

(required)

Connect the IntraSwitch 5308FL to the network.

See “Connecting to the Network” on page 2-9.

6

(optional)

Configure the IntraSwitch 5308FL for
management capabilities.

See “Setting up for Management” on page 2-12.

Advertising