Gradall – Gradall 544D (9136-4003) Service Manual User Manual

Page 323

Advertising
background image

7.2

R

EINSTALLING THE

H

YDRAULIC

S

UB-

A

SSEMBLY

Preparation

Clean and lubricate the inside of the boom sections where the hydraulic

sub-assembly rides.

Install the guide bracket.

Collapse the hydraulic sub-assembly fully.

Fasten both hydraulic carriers together (using tie-wraps or nylon straps).

Retract the booms fully, horizontal.

Reinstallation

Lift the hydraulic sub-assembly in a balanced mode and carefully begin insertion

into boom-section 4.

As the first lie-wrapped area nears the boom, remove the tie-wrap ond continue

insertion (and tie-wrap removal) until the sub-assembly is fully inserted.

Re-connect hydraulic hoses and any optional circuits.

Re-fasten bracket removed under “Preparation”, Step 5, Page 7.1.

Use long-threaded rod and nuts (3/8 x 16) to aid in pulling the bracket into place

if it protrudes too far from the back of the boom.

C

OMPLETE

B

OOM

A

SSEMBLY:

R

EAR

V

IEW

Reinstall the hose take-up compression spring. Torque the jam nut to 100 ft-lb.

There should be 1" from the back of the jam nut to the end of the threads on the

hose take-up weldment.

See Figure Detail in margin

B

OOM

H

EAD:

S

HOWING

H

OSE

T

AKE-UP

W

ILDMENT AT

B

OTTOM,

F

RONT,

B

OOM-

S

ECTION

1

Torque all fasteners and hydraulic fillings per Appendix A, “Fastener Torque Chart”

and Appendix B, “Hose Fitting Torque Chart. “

Note!

Be certain the hydraulic

sub-assembly locks in place on

the pin bracket at the bottom of

boom-section 4.

1.

2.

3.

4.

5.

1.

2.

3.

4.

5.

6.

GRADALL

GRADALL

Advertising