Gradall – Gradall 544D (9136-4003) Service Manual User Manual

Page 337

Advertising
background image

9.10

S

EPARATING BOOM-SECTION

4

FROM BOOM-SECTION

3

Remove the rear bottom (top side of boom package) and side

bearing pads from boom-section 4.

Remove the 3/4" retract chain through the rear of boom-section 4.

Remove the retract chain roller at the rear of boom-section 3.

Remove the front bearing pads and supports.

Carefully pull boom-section 4 from boom-section 3, taking care to protect chains.

Disconnect chains when booms are free of each other.

Place the boom in a designated area for future access.

B

OOM-

S

ECTION

4

D

IS-

A

SSEMBLY

Removal of the hydraulic sub-assembly from the inside of the boom is the most difficult

operation of this dis-assembly. Refer to Section 7, “Hydraulic Sub-Assembly” for removal

instructions. Remember! It is important to tie the two hydraulics carriers together during

removal. This will keep the assembly together and make it easier to remove as a unit. Be

careful when removing the hydraulic sub-assembly from the bracket.

All other components attached to boom-section 4 are exposed and require no specific

removal instructions.

B

OOM-

S

ECTION 4:

S

HOWING

H

YDRAULIC

S

UB-

A

SSEMBLY

GRADALL

GRADALL

1.

2.

3.

4.

5.

6.

7.

Advertising