Gradall 544D (9136-4003) Service Manual User Manual

Page 336

Advertising
background image

9.9

S

EPARATING

B

OOM-

S

ECTION

3

AND

4

F

ROM

B

OOM-

S

ECTION

2

Stage 1

Remove the rear bottom (top side of boom package) and side bearing pads from

boom-section 3.

Remove optional and standard hose sheaves from the rear of-boom-section 2.

Remove the chain and chain clevis from the rear of boom-section 2.

Remove the front bottom chain roller assembly from boom-section 2.

Remove the hydraulic sub-assembly bracket and hardware from the rear of boom-

section 3.

Pull the hydraulic sub-assembly partially out through the rear of boom to access

the hoses.

R

EAR,

B

OOM-

S

ECTION

2

Stage 2

Remove hoses from the rear of the hydraulic sub-assembly.

Remove tension on the chain clevis before proceeding.

Unbolt and remove the chain adjustment block from the bottom of the boom.

Remove all bearing pads from the front of boom-section 2.

FRONT, BOOM-SECTION 2

Stage 3

Carefully pull the third and fourth sections from boom-section 2.

Remove the chain from boom-section 2 to boom-section 3 package when the

booms are free of each other.

F

RONT,

B

OOM-

S

ECTION

3

Chain Roller

Bearing

Pad

1.

2.

3.

4.

5.

6.

1.

2.

3.

4.

1.

2.

B

OOM-

S

ECTION 2,

R

EAR

V

IEW

B

OOM-

S

ECTION

3:

R

EAR

V

IEW

C

OMPLETE

B

OOM

A

SSEMBLY:

R

EAR

V

IEW

F

ORM

N

O.

29702

lllll

544C/544D B

OOM

M

AINTENANCE

Advertising