12 shut down and park, 13 lifting and tie down, Lifting – JLG 1100SB Operator Manual User Manual

Page 63: Lifting -13

Advertising
background image

SECTION 4 - MACHINE OPERATION

3121264

– JLG Lift –

4-13

4.12 SHUT DOWN AND PARK

To shut down and park the machine, the procedures are as
follows:

1. Drive machine to a reasonably well protected area.

2. Ensure boom is lowered over rear drive axle.

3. Push in the Emergency Stop at Platform Controls.

4. Push in the Emergency Stop at Ground Controls. Posi-

tion Platform/Ground Select switch to center OFF.

5. If necessary, cover Platform Controls to protect instruc-

tion placards, warning decals and operating controls
from hostile environment.

4.13 LIFTING AND TIE DOWN

See Figure 4-6. and Figure 4-7.

Lifting

1. Refer to the Serial Number Plate, Specifications section

of this manual, or weigh the individual unit to find out the
Gross Vehicle Weight.

2. Place the boom in the stowed position with the turntable

locked.

3. Remove all loose items from the machine.

4. Attach lifting device and equipment only to the desig-

nated lifting points.

5. Properly adjust the rigging to prevent damage to the

machine and so the machine remains level.

Advertising