Tie down, 14 stowing the jib for transport, Tie down -14 – JLG 1100SB Operator Manual User Manual

Page 64: 14 stowing the jib for transport -14

Advertising
background image

SECTION 4 - MACHINE OPERATION

4-14

– JLG Lift –

3121264

Tie Down

WHEN TRANSPORTING THE MACHINE, THE BOOM MUST BE FULLY
LOWERED INTO THE BOOM REST.

NOTE:

When loading the machine onto a trailer, it will be neces-
sary to rotate the turntable 180 degrees to provide better
weight distribution.

1. Place the boom in the stowed position with the turntable

locked.

2. Remove all loose items from the machine.

3. Secure the chassis and the platform using straps or

chains of adequate strength and attached to the desig-
nated tie down points.

4.14 STOWING THE JIB FOR TRANSPORT

1. Place the boom in the stowed position with the axles

retracted.

2. Hold the Jib Swing control switch to the right until the

platform will no longer swing.

NOTE:

The Jib Swing function is not operable when the Capacity
Select control is in the 1000 lb. (450 kg) position.

NOTE:

Automatic platform leveling is disabled when stowing the
jib.

3. Push and hold the Jib Stow control switch until the jib

and platform are in the stowed position under the boom.

Advertising