INFICON SKY CDG025D-X3 0.1 ... 1000 Torr / mbar process gauge User Manual

Page 17

Advertising
background image

tina57e1 (2010-01)

17

If no sensor cable is available, make one according to the

following diagram.

Electrical connection
Pin 1, 4 Relay SP1, closing contact
Pin 2

Signal output (measuring signal)

or thresholds SP1/2

Pin 5

Supply common, GND

Pin 7, 11 Supply
Pin 8, 9 Relay SP2, closing contact
Pin 10

Gauge identification

Pin 12

Signal common

Pin 13

RS232, TxD

Pin 14

RS232, RxD

Pin 15

Housing (Chassis Ground)

case Connector

case

15

8

9

1

D-Sub,15-pole

female

soldering

side

case

4
1
8
9

10

Ident

13
14

2

TxD

RxD

12

7

11

5

100k

15

100

nF

18

V

10

Connect the sensor cable to the gauge and secure it using

the lock screws.

Connect the sensor cable to the controller.

Advertising