INFICON SKY CDG025D-X3 0.1 ... 1000 Torr / mbar process gauge User Manual
Page 17
Advertising
tina57e1 (2010-01)
17
If no sensor cable is available, make one according to the
following diagram.
Electrical connection
Pin 1, 4 Relay SP1, closing contact
Pin 2
Signal output (measuring signal)
or thresholds SP1/2
Pin 5
Supply common, GND
Pin 7, 11 Supply
Pin 8, 9 Relay SP2, closing contact
Pin 10
Gauge identification
Pin 12
Signal common
Pin 13
RS232, TxD
Pin 14
RS232, RxD
Pin 15
Housing (Chassis Ground)
case Connector
case
15
8
9
1
D-Sub,15-pole
female
soldering
side
case
4
1
8
9
10
Ident
13
14
2
TxD
RxD
12
7
11
5
100k
15
100
nF
18
V
10
Connect the sensor cable to the gauge and secure it using
the lock screws.
Connect the sensor cable to the controller.
Advertising