Final assembly, Figure 3-26: 1,200 foot-pounds of torque, Caution – Landoll 2211 Ripoll User Manual

Page 46

Advertising
background image

3-30

F-571-0613 Edition

ASSEMBLY INSTRUCTIONS

Final Assembly

1.

Attach a tractor to the implement and charge the lift
system hydraulics as described is “Hydraulic Lift
System” on page 4-3.

2.

Install the 1-1/2 x 16 lockouts on both 3-1/2 x 16
cylinders on the frame.

3.

Connect lights to the tractor and verify operation.

4.

Check tires for proper inflation

5.

Level the Ripoll from front to rear as described in
“Leveling (Front-to-Rear)” on page 4-7.

6.

Inspect the final implement assembly, and verify that
all bolts have been tightened, cotter pins spread, and
that there are no leaking hydraulic connections.

CAUTION

7.

Rotate each disc gang to verify that each gang
rotates freely. Adjust any scrapers that may have
shifted during shipment or assembly.

8.

Lubricate the Ripoll at all locations (See
“Lubrication Maintenance” on page 4-17.)

9.

Touch up with paint any areas that may have been
scratched during moving, handling, or assembly.

10. Thoroughly read and understand the operating

section before using the Ripoll.

Figure 3-26: 1,200 Foot-Pounds of Torque

Tighten all 1-3/4" nuts to 1,200 foot-pounds of
torque (See Figure 3-26.)

300

POUNDS

PULL

4 FOOT

2md410-010943

Advertising