Mechanical installation – Lenze i700 Manual User Manual
Page 75

Mechanical installation
Assembly in push−through technique (thermal separation)
l
75
EDS700ACBA EN 4.0
5.3.6
Assembly in push−through technique (thermal separation)
)
Note!
The installation must ensure the required tightness.
For this purpose, the mounting plate with the required cutouts must have a
sufficient rigidity against the seal.
Overview of the mechanical requirements of the mounting position:
Requirements
Cutouts
Tolerance
± 0.5 mm
Corner radius R
1 ... 2 mm
Evenness to the seal
0.5 mm
Fixing holes
Tolerance
± 0.25 mm
Seal
Use thread sealant
Bar reinforcement (suggestion)
Flat material
5 * 20 * 400 mm
Power loss
Type
P
V1
[W]
P
V2
[W]
E70ACPSD0304x
60
20
E70ACMSD0054xx1xxx
30
20
E70ACMSD0104xx1xxx
50
30
E70ACMSD0204xx1xxx
100
30
E70ACMSD0054xx2xxx
60
30
E70ACMSD0104xx2xxx
100
50
E70ACPSD0604x
130
30
E70ACMSD0324xx1xxx
160
50
E70ACMSD0484xx1xxx
230
70
E70ACMSD0644xx1xxx
310
80
E70ACMSD0204xx2xxx
200
60
E70ACMSD0324xx2xxx
310
70
P
V1
separated power loss, to be dissipated via heatsink
P
V2
Power loss remaining in the control cabinet