Commissioning, 5 quick can set-up – Lenze SMD 0-25kW-4-0kW Basic I/O User Manual

Page 32

Advertising
background image

30

Lenze 13466185 EDBSW03 v5

Commissioning

4.5

Quick CAN set-up

1. Power up the controller and set h50 (CAN address) and h51 (CAN baud rate) to

appropriate values.

2. Power down the controller and connect the communication cable. For reliable

communication make sure terminal CAN_GND is connected to CAN network GND/

common. If only two wires are used (CAN_H and CAN_L) in the network, connect CAN_

GND to chassis/earth ground.

3. Power up the controller.
4. Use Global Drive Control Software to configure the required operation of the controller.

Example:

Controller #2 needs to follow the operation of controller #1 (start/stop, speed, etc).

Controller #1 can be controlled by CANopen or traditional control elements (relays, etc).

Controller #1 configuration

Controller #2 configuration

No.

Name

Setting

No.

Name

Setting

h50

CAN address (Node ID) 1

C01

Setpoint source

3 CANopen control

h51

CAN baud rate

5 500 kbps

h45

Error behavior

1 No state change

h52

System bus participant

1 Slave with autostart

enabled

h50

CAN address (Node ID) 2

h51

CAN baud rate

5 500 kbps

h53

Parameter channel 2

(SDO#2)

0 Enable with default

COB ID

h52

System bus participant

1 Slave with autostart

enabled

h84

TPDO#1 event timer

10 ms

h53

Parameter channel 2

(SDO#2)

1 Enable with prog.

COB ID

h86

TPDO#1 mapping

3 Controller status

in C0135 format +

frequency setpoint

unsigned

h60

RPDO#1 COB ID

385

(h80 from controller #1)

h64

RPDO#1 event

monitoring timer

50 ms

h65

RPDO#1 time out

reaction

1 Inhibit

h66

RPDO#1 mapping

1 C0135 control word

+ C46 frequency

setpoint unsigned

A

fter setting the parameters, perform node reset using parameter h58 or cycle the power.

After these controllers are configured as above, controller #2 will follow the operation of controller

#1 including: Inhibit state, Quick Stop, DC brake, JOG speed selections, direction, and speed.

For additional safety, controller #2 will transition to inhibit state if valid PDO is not received from

controller #1 within 50ms.

Advertising
This manual is related to the following products: