Electrical installation – Lenze ECSDAxxx User Manual

Page 112

Advertising
background image

Electrical installation

Power terminals
Motor holding brake connection

5

l

112

EDKCSDX064 DE/EN/FR 3.0

5.2.3.3

Requirements on the brake cables

ƒ

Use a Lenze system cable with integrated brake cable.

The shielding of the brake cable must be separated.

ƒ

Length: max. 50 m

ƒ

If a separately installed brake cable is required, lay it in a shielded manner.

)

Note!

Due to the monitoring circuit of the brake connection, an additional
constant voltage drop of 1.5 V is produced. The voltage drop can be
compensated by a higher voltage at the cable entry.

The voltage required at X6/B+ and X6/B− for the Lenze system cables is
calculated as follows:

U

K

[V]

+ U

B

[V]

) 0.08

ƪ

V

m

@ A

ƫ

@ L

L

[m]

@ I

B

[A]

) 1.5 [V]

V

co

mp

Voltage required at 6X/B+ and X6/B− [V]

V

B

Rated operating voltage of the brake [V]

L

L

Length of the brake cable [m]

I

B

Brake current [A]

B+

B-

X6

BD2

BD1

X25

+

+23 ... +30 V DC

max. 1.5 A

F 1.6 A

_

+

_

1.5

A

M

3~

+

"

"

ECSXA017

Fig. 5−4

Connection of the motor holding brake to X25

"

HF−shield termination by large−surface connection to functional earth (see
Mounting Instructions for ECSZS000X0B shield mounting kit)