2 operation with another supplier, Operation with another supplier, Electrical installation – Lenze ECSxK series User Manual

Page 33: Stop

Advertising
background image

Electrical installation

Wiring

Operation with another supplier

5

33

EDBCSXKXXX EN 1.0

5.6.2

Operation with another supplier

Stop!

ƒ

After mains connection, wait at least one second before bridging the

charging current limitation (X26 = HIGH).

ƒ

Only release the controller (X6/SI1 = HIGH) if the charging current limitation

is bridged.

t [s]

1 (HIGH)

0 (LOW)

ECSxA: X6/SI1 (CINH)

t [s]

100 %

0 %

t [s]

1 (HIGH)

0 (LOW)

ECSxK: X26 (24 V DC)

t [s]

1 (HIGH)

0 (LOW)

K1

U

ZK

1

ECSXK011

Fig.5-4

Level/time diagrams for operation with other supplier

Show/Hide Bookmarks

Advertising