In this example, MPX had the axial channel named "Axial" while the controller had the axial channel
named "Ch 1." By changing the MPX names to "Ch 1," the resource naming errors were eliminated.

Create a New Test Run

1. Power up the system.

a) For the HPU, click Low, and then High.
b) For the HSM, click Low, and then High.

2. Click the New Test Run icon.

106 | MTS TestLine Test System Operation

Running the Example HCF Test