Rockwell Automation 1784-PM16SE SoftLogix Motion Card Setup and Configuration Manual User Manual
Page 424
Advertising

Publication 1784-UM003A-EN-P – June 2003
416 Troubleshooting
SERCOS Communication Phase Status Using the CP Indicator
If the CP LED displays:
Then the card status is:
Solid Orange
In Phase -1: Autobaud detection in progress.
Off
In Phase 0: looking for a closed ring.
Flashing Red
In Phase 1: looking for active nodes.
Alternating Red/Green
In Phase 2: configuring nodes for
communication.
Flashing Green
In Phase 3: configuring device specific
parameters
Solid Green
In Phase 4: configured and active.
Advertising
This manual is related to the following products: